Automated control system of gas turbine power plant GTG-12, PES "Urengoy", Novy Urengoy, RF
The automated control system of the GTG-12 gas turbine power plant based on the DC-59 engine is designed to automate the control, protection and control of the engine, generator and auxiliary equipment of the GTG-12 gas turbine power plant.
General system parameters:
Analog inputs 4-20mA -76 pcs
Analog outputs 4-20mA - 2 pcs
Analog inputs Pt100 - 20 pcs.
Discrete inputs 24VDC -128 pcs
Discrete outputs 24VDC -64 pcs
System implementation period -8 months
Commissioning date - 2009
(2 settings)
Commissioning plan for 2010 - 5 units